GrantSet

Solicitation · W50S8126BA012

W50S8126BA012

Responses due11 days leftSep 29, 2026, 2:00 AM EDT
Sub-tierDepartment of the Army
OfficeW7ne Uspfo Activity Maang 104
PSCY1PZ
PostedAug 27, 2026
DeadlineSep 29, 2026, 2:00 AM EDT
Place of performance01085
From the notice

THIS PROJECT REQUIRES ALL LABOR, TOOLS, EQUIPMENT, MATERIALS, TRANSPORTATION, ENGINEERING, AND SUPERVISION TO PERFORM UTILITY ROUTING FOR PROJECT AXQD242790, ALLIED SUPPORT SUNSHADES UTILITY INFRASTRUCTURE, AT 104 FW, BARNES ANGB, WESTFIELD, MA 01085. SCOPE: ESTABLISH A SECURE, REDUNDANT UNDERGROUND UTILITY CORRIDOR FOR 480V POWER AND OSP FIBER TO TWO TIE-IN POINTS. WORK INCLUDES APPROXIMATELY 800 LF OF HORIZONTAL DIRECTIONAL DRILLING, HDD, UNDER AIRFIELD PAVEMENTS AT MINIMUM 8 FT DEPTH; PRIMARY CIRCUIT TIE-IN SPLICING INTO 22.9KV BASE LOOP IN MANHOLE 110, EMH 110, WITH IEEE 386 200A ELBOWS; INSTALLATION OF ONE PAD-MOUNTED TRANSFORMER, 22.9KV PRIMARY TO 480Y/277V SECONDARY, 250KVA, ON FROST-PROTECTED CONCRETE PAD; BACKUP SYSTEM WITH 400A NEMA 3R MANUAL TRANSFER SWITCH AND CANNON PLUG RECEPTACLE; AND NEMA 3R/4X COMMUNICATIONS CABINET WITH FIBER PATCH PANELS. WORK ALSO INCLUDES AIRFIELD PAVEMENT RESTORATION, REMARKING PER UFC 3-260-04, PE-STAMPED LOAD STUDY, AND QUALITY LEVEL B SUE UTIL…

Excerpt as published. The complete description, attachments, and any amendments are on the official notice.

View the official notice on SAM.gov ↗

GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.