Combined Synopsis/Solicitation · FA283526Q0020
66 ABG/SC Giant Voice RTU Relocation
Relocate one (1) Giant Voice (GV) Remote Terminal Unit (RTU) from the 3rd floor of building 1108. This RTU is one of six RTUs that are part of the base-wide ATI Mass Alert system, which is controlled by two Central Control Units (REACT 5000s). The Contractor shall provide all specialized labor, materials, tools, equipment, and supervision required to safely power down, physically transport, re-install, and re-integrate the system. The objective is to ensure the RTU is restored to Full Operational Capability (FOC) in the new location. This includes the proper handling of all associated radio frequency (RF) cabling, network connections, power configurations, and grounding systems, as well as conducting comprehensive post-move testing and optimization to verify system integrity. NOTE: A site visit is scheduled for 23 July 2026 at 9:00am EST at Hanscom AFB, MA. You MUST register prior to attending. Registration to attend the site vist must be provided to kennethea.berry.1@us.af.mil no lat…
Excerpt as published. The complete description, attachments, and any amendments are on the official notice.
GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.