Combined Synopsis/Solicitation · W911RZ26QA032
4CAB Service Petroleum Oils and Lubricant Shelter Repair
The contractor shall remove outdated heating and electrical components and install new, fully functional systems tailored to each shelter�s needs. Work includes replacing the existing 10kW, 34K BTU electric heaters in Shelters 1 and 2; installing new non-explosion-proof light and fan switch kits (two-switch assemblies) in all applicable shelters; and providing new explosion-proof interior light assemblies in Shelters 2 and 3. All repairs must ensure the shelters meet operational requirements for the safe storage of petroleum, oil, and lubricants and restore reliable environmental control across the facility.
Excerpt as published. The complete description, attachments, and any amendments are on the official notice.
GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.