Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 2-2025. Specification No. OM25136

Responses due303 days leftMay 28, 2027, 11:30 AM EDT
Sub-tierDepartment of the Army
OfficeW07v Endist New Orleans
PSCY1KF
Set-asideNone stated
PostedMay 12, 2025
DeadlineMay 28, 2027, 11:30 AM EDT
Place of performanceLA
From the notice

Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 2-2025. Specification No. OM25136 The Contractor's dredge and attendant plant will primarily be used in connection with the construction and possible maintenance of a saltwater barrier sill located between Mile 63.0 and Mile 64.0 Above Head of Passes (AHP) on the Mississippi. The work will consist of satisfactorily placing hydraulically dredged material which shall be taken from a borrow area located on the river bottom. The contract plates show the approximate location of the sill and configuration of the sill (should the sill need to be built to -30� LWRP with a 620� notch to -55� LWRP) and borrow areas. Further details of the location, size, and configuration of the sill and borrow area required will be given in the dredging assignments. The magnitude of construction range for this Dredge project is between $10,000,000.00 and $25,000,000.00. This solicitation will be issued on or abou…

Excerpt as published. The complete description, attachments, and any amendments are on the official notice.

View the official notice on SAM.gov ↗

GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.