Presolicitation · 1141206
Lagoon Aeration
Work for this project requires the contractor to be responsible for for furnishing and supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized in the SOW: 1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect. 2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits. 3. Furnish and install microbubble lagoon aeration system consisting of the following: a. Control panel with individual motor overload protection circuit breakers. b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each). 4. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure. 5. Furnish third-party inspection of electrical work included in t…
Excerpt as published. The complete description, attachments, and any amendments are on the official notice.
GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.