GrantSet

Combined Synopsis/Solicitation · F4FANG6133A001

EOU Sunshades Creech AFB

Responses due2 days leftJul 31, 2026, 1:00 PM EDT
Sub-tierDepartment of the Air Force
OfficeFa4861 99 Cons Lgc
PSC5450
PostedJun 25, 2026
DeadlineJul 31, 2026, 1:00 PM EDT
Place of performanceIndian Springs, NV, 89018
From the notice

The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site. Also, the relocation of the four existing structures and demolition of the 5th sunshade. Four current sunshades will be turned perpendicular and align with the new sunshades. The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron: 1) Four CCA shade structures that include four aircraft parking bays each. The new shade structures will be located on south ramp west of the current shade structures. 2) Column concrete footings, per footing, as needed. 3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light. 4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery …

Excerpt as published. The complete description, attachments, and any amendments are on the official notice.

View the official notice on SAM.gov ↗

GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.