Combined Synopsis/Solicitation · 1333ND26RNB190032
Steam Tunnel Ventilation Replacement
SEE ATTACHMENTS FOR FULL PROJECT DETAILS Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST, Boulder, CO This acquisition is a 100% Small Business Set-Aside. The NAICS for this acquisition is 236220; the Small Business Size Standard is $45.0 Million. The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with (2) natural gas indirect fired make up air units (MAU�s). This construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation MAU�s, and all associated systems required for safe, reliable, and continuous ventilation system. Work will be planned and phased to be performed between the months of May 1 through October 31, mitigating the chances for pipes to freeze.
Excerpt as published. The complete description, attachments, and any amendments are on the official notice.
GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.