Solicitation · FA441826Q0098
FY26 NPTU High-Pressure Air Compressors (HPAC) Mx
The Nuclear Power Training Unit (NPTU) requires a major maintenance overhaul of its High-Pressure Air (AHP) System to maintain operational reliability, readiness, and mission support. To sustain critical operations, the multi-stage AHP compressors require an 8,000-hour major overhaul, encompassing complete teardown, component replacement, tolerance verification, and re-certification. The Contractor shall provide all labor, certified replacement parts, tooling, and test equipment necessary to execute the 8,000-hour major overhaul on the designated AHP compressors. All maintenance, inspections, and re-certification procedures shall be performed strictly in accordance with Maintenance Requirement Card (MRC) AHP-R-2 (Rev 3) (Attachment 02). Maintenance actions must be phased to ensure continuous, redundant compressor availability throughout the period of performance. Please be advised that the full requirements, including Instructions to Offerors (FAR 52.212-1) and the basis for evaluatio…
Excerpt as published. The complete description, attachments, and any amendments are on the official notice.
GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.