Special Notice · FA664825C0007P00002
REPAIR AIRCRAFT FIRE TRAINING FACILITY HOMESTEAD AIR RESERVE BASE (HARB) FL
This modification will add necessary alterations to ongoing construction to the Fire Traininer facility. 1. Demolition & Site Preparation: Demolish and dispose of the existing in-pond non-operational submersible pump; drain the retention pond and clear accumulated algae/debris. 2. Civil Foundation: Construct a new on-land reinforced concrete foundation pad for the relocated external pump system. 3. Mechanical & Engineering: Furnish and install a new external pump system, including signed/sealed Professional Engineer (PE) design drawings and Net Positive Suction Head (NPSH) calculations. 4. Electrical & Controls: Trench and install approximately 50 linear feet of new electrical conduit and wiring, integrating the pump system into the Fire Training Facility and the new CNOT (Control Tower). The incumbent contractor, Guardian Construction, Inc., is currently mobilized on-site performing comprehensive mechanical, structural, and control construction to the Fire Trainer under Contract FA66…
Excerpt as published. The complete description, attachments, and any amendments are on the official notice.
GrantSet indexes public records and is not the official application channel. Responses and applications go through SAM.gov only — the official notice there controls if anything shown here differs.